Maintenance work at an FCCU: Contractor needed as soon as possible
Feb 16:   Maintenance work will be started by June,  2017. 
It includes fabrication of upper conical portion of the secondary cyclone upto dip leg joint.
Contractor will work with:
8Welding consumables
8Weld joint design 
8Radiography 
8DP testing scope
8Hex mesh installation   
8Picking and Passivation requirement 