All content in this website is sourced legitimately

Article Details
Page No:  1
Maintenance shutdown of FCCU units
Feb 06:   An existing refinery is planning for a maintenance shutdown of the FCCU units soon.
8List of equipment that will possibly be needed includes:            

-- fractionators

-- condensors

-- reflux drum

-- air fin cooler tube

-- pumps

-- plates

-- heater

-- nozzle

-- vessels

-- columns cyclones

-- air blower

-- wet gas compressors

-- relief valves

-- boiler

-- electrostatic precipitators

 Details

**********************************

<< Back  |  Top
 
The content in this website is authentic and all information is sourced legitimately. The news we produce is collated through journalistic effort that is legal and legitimate. We carry no information that violates Indian law or is a breach of confidentiality in any form or manner.
Copyright 2017 www.indianpetroplus.com. All rights reserved