All content in this website is sourced legitimately

Article Details
Page No:  1
Drilling programme-II: Rs 200 crore GCC and pipeline network in May, 2017
Nov 29:   Along with the drilling programme, an investment is proposed for a Rs 200 crore investment in a Gas Collection Centre and an attendant pipeline network
8Environment clearance is expected in May, 2017
8EOIs are to be floated by March, 2017 for a header, piping systems, test separator, production separator, test tank, production tank, oil transfer pump and flare stack system
Click on Details for more
 Details

**********************************

<< Back  |  Top
 
The content in this website is authentic and all information is sourced legitimately. The news we produce is collated through journalistic effort that is legal and legitimate. We carry no information that violates Indian law or is a breach of confidentiality in any form or manner.
Copyright 2017 www.indianpetroplus.com. All rights reserved