All content in this website is sourced legitimately

Page No: 1
Business opportunities coming in power sector
Apr 16: 8Project Name: Super Thermal Power Station - Installation of FGD
8Project Cost: 500 crores
8Project Description: Owner is carrying out the feasibility report activities for installation of a Wet Flue Gas Desulphurisation (WFGD) Unit at its 1500 MW in the 4000 MW thermal power complex in order to comply with new environmental norms. The project requirement are: absorber system, gas to gas heat exchanger, piles, scaffolding, ladders, dozers, limestone silos, slurry tanks, booster fan, wet ball mills, slurry re-circulation pumps, bucket elevator, gypsum dehydration, stairways, among others.
8Project Event: RFQ for installation of Wet Flue Gas Desulphurization Unit is expected by June 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: Jun/2018
8Release Date: Jul/2018
8Start Date: Mar/2019
8Completion Date: Q2:2021
Click here for more information
8Project Name: Thermal Power Station Maintenance Project
8Project Cost: 15 crores
8Project Description: Promoter has planned a 25-day scheduled annual maintenance of boiler, turbine and generator in the 600 MW of its 2000 MW  thermal power complex. The mandatory job includes acid cleaning of boiler, water tubes, boiler drum, dearator, checking and replacement of pressure parts of boiler, replacement of pipes in pent house, checking of bukstay links, replacement of seals, journal bearing and thrust bearing of the turbine and generator, among others.
8Project Event: RFQs for required equipment are expected in June 2018.
Click here for more information
8Project Name: Brownfield Thermal Power Plant Expansion
8Project Cost: 5000 crores
8Project Description: Owner is getting delayed in awarding the LOA to the EPC contractor for a brownfield 800 MW super-critical plant at its thermal power station. The EPC contractor in turn will come out with RFQs  only after the LOA has been awarded. The project requirements are: steam turbine, boiler, hot air generator, coal handling plant, pulverizer, stacker-reclaimer, dozers, cranes, elevators, piles, ash handling plant, cooling tower, preheater, heat exchanger, chimney, water treatment plant, DM plant, fire fighting system,turbine oil purification system, switch-yard equipment, wagon tippler, conveyer belts, ESP, among others.
8Project Event: RFQs for civil works and transportation services are expected by May 2018.
8Expenditure Approval: May/2015
8RFQ Date: May/2018
8Release Date: Q3:2018
8Start Date: Q1:2019
8Completion Date: Q3:2023
Click here for more information

**********************************

Back  |  Top