Business opportunities coming ahead in power sector
Apr 11: 8Project Name: Absorber System Package in Thermal Power Station
8Project Cost: 600 crores
8Project Description: The owner is planning to install an absorber system package in the 1200 MW out of the 3500 MW thermal power complex.  Further RFQs are expected subsequently. The project requirements are: absorber limestone slurry re-circulation pumps, absorber oxidation air blowers, absorber tank slurry agitators, mist eliminator, silos, scaffolding, piles, elevators, water distribution systems, hand railing and fittings, slurry tanks, among others.
8Project Event: RFQs for absorber system package are expected in May 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: May/2018
8Release Date: Jun/2018
8Start Date: Q3:2018
8Completion Date: Q3:2019
Click here for more information
8Project Name: Greenfield Hydroelectric Project
8Project Cost: 1500 crores
8Project Description: Owner is at the final stage of forest clearance for a 100 MW greenfield hydroelectric plant. The project is getting delayed on lack of the forest clearance. Further RFQs are expected in package wise mode shortly. The project requirements are: civil works, tunnel boring machine, elevators, diversion tunnel, coffer dam, generator, powerhouse equipment, hydro-mechanical equipment, cranes, among others.
8Project Event: RFQ for civil and infrastructure package is expected by May 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: May/2018
8Release Date: Jul/2018
8Start Date: Q2:2019
8Completion Date: Q4:2023
Click here for more information
8Project Name: Thermal Power Station Maintenance Project
8Project Cost: 25 crores
8Project Description: The developer has planned a 25-day scheduled annual maintenance in 900 MW thermal power plant. The mandatory job includes acid cleaning of boiler, water tubes, boiler drum, dearator, checking and replacement of pressure parts of boiler, inspection of wind box supports and its expansion joints, journal bearing and thrust bearing of turbine, replacement of pipes,among others.
8Project Event: RFQ for equipment required is expected by second week of May 2018.
Click here for more information
Contact Update : 
Contacts are an important tool in the hands of a business development manager. We put in great efforts to get you validated telephone numbers of departmental heads within the power industry.
8A general manager has been promoted as Executive Director and has been shifted to a major thermal power station.

**********************************

Back  |  Top