All content in this website is sourced legitimately

Article Details
Page No:  1
Business Opportunity I: Construction of Gas Compression Station and Gas Gathering Station coming up
Feb 14:   The E&P major is panning the construction of a Gas Compression Station and Gas Gathering Station along with a network of underground seamless pipeline with Cathodic protection.
8The total investment of the project is around Rs.100 crore.
Equipment for which RFQs are to be floated by March, 2017 are as follows:
-- 
Manifold and Vessels
-- Heat exchangers and Pumps (ETP, OWS, Fire pump etc.) 
-- Tanks will float
-- Electrical and Instrumentation
-- Mechanical and civil equipments
There will also be several miscellaneous items, for which the RFQs are expected to float by Mar, 2017 too. These items are under Details below  Details

**********************************

<< Back  |  Top
 
The content in this website is authentic and all information is sourced legitimately. The news we produce is collated through journalistic effort that is legal and legitimate. We carry no information that violates Indian law or is a breach of confidentiality in any form or manner.
Copyright 2017 www.indianpetroplus.com. All rights reserved