Big onland IOR-EOR programme-IV: Well repair requirements coming up
Dec 19: Many wells are under repair in the onland asset The following business development requirements are there 8Sand Cleanout equipment 8Swabbing equipment 8Hot Oiling equipments (swabbing assembly, lubricator with an oil saver, and shut-off valve on the well) 8Snubbing equipment 8Coil Tubing equipment 8Repairing Liners and Casing equipments (Squeeze cementing, Patching a liner, Replacing casing, Adding a liner and Opening collapsed casing.) 8Sidetracking equipments (Special drill tools, such as a whipstock, bent housing, or bent sub) 8Plug-back dump bailer equipment 8Plug-back tubing equipment Click on Details for more