All content in this website is sourced legitimately

Article Details
Page No:  1
Award of contracts expected by March-April for a gas pipeline
Feb 20:   The operator is expected to award contracts for a gas evacuation pipeline in March-April, 2017.
8It is an 18” dia pipeline.
8The capacity of the pipeline is 3.8 MMSCMD
8The Length of the pipeline is around 180 km..
Click on details for more.
 Details

**********************************

<< Back  |  Top
 
The content in this website is authentic and all information is sourced legitimately. The news we produce is collated through journalistic effort that is legal and legitimate. We carry no information that violates Indian law or is a breach of confidentiality in any form or manner.
Copyright 2017 www.indianpetroplus.com. All rights reserved